Tunbridge Wells Girls Grammar School
Job No* 2476
Our scope for this project included providing 1100 m^2 of safety netting and 150 lm of class A edge protection to the high roof area as well as providing access with a 10 m Haki stair tower.
We began works on this project in March 2020 and had to abide by a tight schedule for deliveries and collections of materials.
We also returned in May to inspect the works and to assure the client that the tower was both tied into steelwork and provided with a scaff tag. The edge protection was measured to the correct height from the roof with no gaps greater than 470 mm and there were no gaps in the safety netting. With rope ties at 2.5 m spacings.