top of page
Heathrow-1
Heathrow-2
Heathrow-1
1/2
Hilton Hotel Heathrow
Job No* 2355
Our scope for this project was to supply 450 m^2 safety netting and a total of over 250 lm of edge protection to the various roof levels.
The team had to utilise their handrail skills to assure they provided adequate protection to each of the roof areas despite the heights and complicated shape of the building.
This project commenced in 2018 and was officially handed over on 13th November 2018.
bottom of page