top of page

DSV Solutions Ltd Peterborough

Job No* 2341

Our scope for this project was to provide suitable triple rail edge protection with toe boards to each mezzanine level. While also supplying access for operatives as well as material loading bays to each floor.

The meterage of the project totalled 475 lm of edge protection along with a 12.5 m Haki access tower.

We began this project in September 2018 allowing safe working areas for operatives.

bottom of page